. . . but are having well-earned break after some darned fine bricklaying. So here is how it was looking this morning at the front of the building:
And at the children’s room on the eastern wing.
Meanwhile, Nick is carting the gravel to fill the drain trenches for the loos:
As promised, the pace is hotting up this week as the walls start to rise. Although I believe that once they are right round the building footprint there will be a pause while the floor is laid. Watch this space!